Sunday, November 22, 2026 Altadena · Pasadena, California
Pasadena

The Walk From Memorial Park Station to the Rose Bowl Is Getting a Redesign — and a Public Session November 19

The Rose Bowl stadium in Pasadena

The walk and bike ride between the Metro A Line’s Memorial Park Station and the Rose Bowl is one of Pasadena’s most-used event routes — and one of its least comfortable. The city is now designing the fix, and it wants residents in the room: a community information session on the Rose Bowl Multimodal Olympic Route Project, Thursday, November 19, 2026, from 6 to 8 p.m. at the Pasadena Senior Center, 85 E. Holly Street. Spanish interpretation, refreshments, and children’s activities will be provided.

What the project is

The project builds the “first and last mile” between the Memorial Park Station and the stadium — the half-mile around the station where most event trips start and end on foot. The city’s Capital Improvement Program describes the toolbox: curb extensions, high-visibility crosswalks, signal timing changes, bike infrastructure, and wayfinding signage, all aimed at making the walk and ride between the train and the Rose Bowl safer.

The deadline driving it is the 2028 Olympic and Paralympic Games, when the Rose Bowl hosts Olympic soccer and Memorial Park becomes the station thousands of spectators pour through. The city’s pitch is that the improvements outlast the Games: the same route serves every Rose Bowl event, every parade morning, and every ordinary day in the Arroyo.

Where it stands

This is still a planning project, not a construction schedule. The FY 2027–2031 Capital Improvement Program lists it as a new project at $7.17 million, with the work to begin when funding is identified; the Transportation Department has been developing it with LA Metro, which designated the station-to-stadium connection a high-value corridor for the Games, and the city has pursued grant funding for outreach, design, and construction. A first community meeting was held October 29 at Maranatha High School on the related Pasadena Avenue & St. John work.

That is exactly why the November 19 session matters: the design is still being shaped, and the people who walk this route on event days know where it fails — the crossings, the dark stretches, the bike conflicts. Show up and put it on the record.

Photo credit: The Rose Bowl, via Wikimedia Commons (public domain).

Sources: City of Pasadena (@PasadenaGov), Nov. 6, 2026; City of Pasadena FY 2027–2031 Capital Improvement Program staff report, April 8, 2026; Pasadena Department of Transportation project flyer, October 2026; Councilmember Tyron Hampton, District 1 newsletter, Nov. 6, 2026 (session details).

VictorM

Victor Caballero writes AltaPasa, covering Altadena and Pasadena civic life, Eaton Fire recovery, and news from JPL and Caltech.

Leave a Reply

Your email address will not be published. Required fields are marked *

Police Calls Map